Benchmarking Under Risks and Uncertainties
Image from iStockPhoto.
Generally speaking, benchmarking is a structured process of comparing and ranking different processes, organizations, properties, assets, and other entities. Its purpose is to identify shortcomings and opportunities for improvement. In theory, almost anything can be benchmarked, from hospital or airport operations to oil production or investment opportunities.
Benchmarkia has developed a benchmarking methodology that takes into account the risks associated with different assets and operations. Let us assume that you want to compare and rank several assets, such as automotive assembly plants. You collect data for a range of KPIs that measure not only cost and output, but also labor productivity, line utilization, quality, reliability, energy efficiency, logistics, and capital efficiency. You then assign weights to the different KPIs, calculate an overall score for each plant, and rank the plants according to their scores.
Everything may appear straightforward, except that this process does not include two very important factors: the risks and uncertainties associated with each value. For example, a plant may currently produce high-quality products, but there may be a risk that product quality will deteriorate because of aging equipment. Similarly, energy consumption at the plant may increase because of new technological requirements. Risks may be related to safety, security, environmental performance, public relations, cost, and many other factors.
In addition to risk events, each value used in the benchmarking analysis is subject to uncertainty. The values themselves may be uncertain. For example, a plant’s GHG emissions may not be measured correctly or consistently, while labor availability may be better represented by a range of possible values rather than by a single value.
In other words, each value used in benchmarking can be represented as a statistical distribution rather than as a single deterministic value. Consequently, the score of each plant is also a statistical distribution. These score distributions can be calculated using Monte Carlo simulation.
There is another important complication. The same risk can affect multiple categories, such as safety, security, environmental performance, cost, or reputation. Therefore, scores should be calculated and rankings performed separately for each category. Each category may also have a different weight. For example, safety may be considered four times more important than cost. These category weights can then be used to calculate an integrated score across all categories.
Here is an example of how the benchmarking results may look:
Each dot on this chart represents a plant. The horizontal axis represents the risk associated with the score. Risk can be expressed as a standard deviation, or another statistical measure. The vertical axis represents the score, expressed, for example, as the mean of the statistical distribution. Plant 7 appears to have the highest score, but at the same time, it also has the highest level of risk. This risk should be taken into account in the decision-making process when evaluating opportunities to improve the operational efficiency of the plants.